International Journal of Industrial Engineering and Management

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut ero labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco.

GUIDE FOR AUTHORS SUBMIT MANUSCRIPT
Vol. 7 No. 3 (2016)
Original Research Article

Reengineering the Port Equipment Maintenance Process

Branislav Stevanov Faculty of Technical Sciences, University of Novi Sad

Bio
Ninoslav Zuber Faculty of Technical Sciences, University of Novi Sad

Bio
Rastislav Šostakov Faculty of Technical Sciences, University of Novi Sad

Bio
Zdravko Tešić Faculty of Technical Sciences, University of Novi Sad

Bio
Sanja Bojić Faculty of Technical Sciences, University of Novi Sad

Bio
Milosav Georgijević Faculty of Technical Sciences, University of Novi Sad

Bio
Atila Zelić Faculty of Technical Sciences, University of Novi Sad

Bio

Published 2016-09-30

Keywords

  • business process,
  • maintenance,
  • model,
  • performance indicators

Abstract

For the river port, the equipment maintenance is very important process because it directly influencesthe operational efficiency. Efficient equipment maintenance process demands accurate equipment data collection, clearly defined tasks, work order management, inventory control and reporting. This paper shows how equipment data can be collected and the analysis and reengineering of the equipment maintenance process. The result is the reengineered equipment maintenance process which is presented in the form of the process model with defined key performance indicators. This model and performance indicators can then serve as a basis for the integration of the maintenance process with other port processes and into the port management information system.

 

Article history: Received (16.04.2015); Revised (02.09.2015); Accepted (24.02.2016)