International Journal of Industrial Engineering and Management

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut ero labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco.

GUIDE FOR AUTHORS SUBMIT MANUSCRIPT
Vol. 2 No. 4 (2011)
Original Research Article

Location of kit preparation - Impact on in-plant materials supply performance

Robin Hanson Chalmers University of Technology

Bio
Mats I. Johansson Chalmers University of Technology image/svg+xml

Bio
Lars Medbo Chalmers University of Technology

Bio

Published 2011-12-30

Keywords

  • Kitting,
  • location of kit preparation,
  • in-plant materials supply

Abstract

The current paper aims to determine how the location of kit preparation affects in-plant materials supply performance. To achieve this, three different cases were identified, where principally different locations for kit preparation could be studied and compared: (1) at the assembly line, (2) in the main storage of the assembly plant, and (3) in a separate kit preparation area in-between storage and assembly line. By use of a theoretical framework, developed in the paper, an analysis is made of how the materials supply performance in the cases is linked to the location of the kit preparation.

 

Article history: Received (10.06.2011); Revised (28.10.2011); Accepted (28.10.2011)