Muhiu, S., Wakiru, J. and Muchiri, P. (2025) “Reliability-Based Preventive Maintenance Scheduling of a Multi-unit Injection Molding System: A Case Study”, International Journal of Industrial Engineering and Management, 16(1), pp. 24–39. doi: 10.24867/IJIEM-368.