Production development of one axial - symmetrical work-piece out of seam tube through necking-in method
Published 2001-12-28
abstract views: 8 // Full text article (PDF): 5
How to Cite
This work is licensed under a Creative Commons Attribution 4.0 International License.
Abstract
In the Study, there is a production process of one axial-symmetrical work-piece out of steel seam tube analyzed. Work-piece development is based on the preparatory sample out of seam tube in order to prove the optimality of the production. Preparatory sample diameter necking-in process is performed within two phases using two tools. Samples produced during the experiment fulfilled required mechanical and dimensional requirements.